$50,000 Recovered After Missed Framing Damage

Snapshot

A homeowner and their contractor came to Property Loss Pro after the carrier’s adjuster and an independent adjuster insisted all structural damage was covered. The contractor knew the framing scope didn’t match the real work required.

After a full review, we identified major framing omissions and secured nearly $50,000 in additional approved repairs, including proper Overhead & Profit (O&P).

The Problem

The original carrier estimates:

  • Missed significant wall, ceiling, and sub-floor framing repairs

  • Omitted required structural reinforcement and code-triggered work

  • Under-scoped demolition, temporary shoring, and safe-work practices

  • Ignored trade sequencing and specialty labor needs

Removed standard GC Overhead & Profit despite multiple trades being involved

The result:

The contractor couldn’t complete the job for the approved amount, and the homeowner was exposed to major out-of-pocket costs for necessary structural repairs.

What Property Loss Pro Did

1. Deep Structural Review

We reviewed the contractor’s photos, videos, and site notes and identified:

  • Hidden framing damage behind finishes

  • Sagging joists needing sistering

  • Load-bearing studs misclassified as “cosmetic”

  • Missing sub-floor removal and replacement

No line items for temporary shoring or OSHA-driven procedures

2. Line-by-Line Estimate Analysis

We compared the adjuster and IA estimates against real-world construction:

  • 14+ structural line items completely omitted

  • Demolition quantities off by 30–50%

  • Labor minimums and setup/cleanup missing

  • Code-driven repairs not addressed

  • O&P removed with no policy-based justification

3. Corrected Xactimate Scope & Justification

We rebuilt the structural scope in Xactimate to match actual repair needs, including:

  • Proper framing assemblies and quantities

  • Building code and OSHA triggers

  • Trade sequencing and GC coordination

  • Carrier-ready F9 notes and a written variance report

We then prepared a clean supplemental package the adjuster could approve without confusion or re-work.

The Result

~$50,000 in additional structural repair funds approved

Full 10% Overhead & 10% Profit applied where appropriate

Contractor could perform the work safely and correctly—without eating costs

Homeowner avoided large out-of-pocket expenses and received a realistic repair budget

Why This Matters

Framing and structural components are some of the most commonly missed items in property insurance claims. They’re often hidden, technical, and easy to under-scope.

Property Loss Pro bridges the gap between:

What the adjuster writes

What the contractor actually needs to build

What building codes and safety standards really require

So homeowners and contractors aren’t left trying to fix structural problems with an underfunded claim.